Delivering safely
& on time!
High speed fiber communications, reliable electric power, and clean water/wastewater distribution are among the services Pathfinder provides. From small rural water districts, municipalities, and private developers, up to the largest telecommunications company in the world and some of the largest investor owned utilities, count on Pathfinder to deliver safely and on time.

Trenching
Chain, rock saw, and open excavation

In open areas with less onerous restoration requirements, trenching is a highly cost effective method of installing utilities in all ground conditions
Horizontal Directional Drilling
aka Boring or HDD

In the increasingly congested urban environment, HDD is a reliable, safe method to install utilities without disturbing the surface while crossing other lines, highways, waterways, and other obstacles
Terminations
Power distribution equipment up to 34,500 volts

Pathfinder's team of terminators ensure all cables, transformers, enclosures, and switch gear are terminated, tagged, and tested. Linemen in bucket trucks tie in to the main line while the system stays energized

UTILITIES PROJECT HISTORY



THE GROVE
EDMOND

PROJECT DETAILS
The Grove is a large subdivision built in multiple phases in Edmond, OK
-
TRANSFORMER PLACEMENT
-
HIGHWAY BORES
-
STREET BORES
-
SERVICE PEDESTALS
-
TERMINATIONS
-
TRENCHING
-
LAYING OF PRIMARY & SECONDARY CABLES